The Miller | December 16, 2005
Rebuild the Bridge The meeting for rebuilding the bridge was held 12/14/05. (Last weeks meeting was cancelled because of snow.) Apex Masonry put in a bid of $22, 720. for rebuilding the two abutments and the center pier. They are going to dismantle the stacks of stone down to grade, repair and / or replace [...]
Category: Bridge |
No Comments »
Tags:
The Miller | December 10, 2005
3rd Attempt to put a photo on the BLOG. If there is a photo here it is of MMS AE with the drawing of the new covered bridge.
Category: Bridge |
No Comments »
Tags:
The Miller | December 2, 2005
The architect brought a contractor to examine the abutments. He is going to get us a bid for removing some of the sandstone blocks, examining the abutments, repairing or replacing some of the blocks and re-stacking the blocks. These are large blocks so it will probably take a crane to move them. We should get [...]
Category: Bridge |
No Comments »
Tags: