Jacking Around at the Mill

| January 1, 2012

Dave Gahimer and I are starting the job of raising the mill to put in the new posts.  The floors are sagging ……. so, they need to be jacked up before the new posts go in.  We figure moving the floors up 1/2 in. at a time is safe.  This is moving 3 floors of […]