Building Ramp for Bridge

Posted By on July 20, 2006

Still no photos on the blog. Do you think they are in cyber space? Oh well. They have been dumping dirt to build the ramp for the covered bridge. They plan to build the 2 spans side by side and then roll them up to the old bridge site where they will be set with cranes. (It is a double span – that means 2 spans or 2 bridges that meet in the middle of the creek on the center pier). Dave is still working on the pieces. Hopefully he will be done soon and the assembly will start.

Mike Roe
Bridgeton Mill

About the author

Owner of the Bridgeton Mill

Comments

3 Responses to “Building Ramp for Bridge”

  1. Preserving as much as possible of the building’s original features is top of mind for the crew.

  2. Kim Berly says:

    Thanks for sharing this information. I really like it very much. You have really shared a informative and interesting post with people painting wall

  3. Kim Berly says:

    Thanks for taking this opportunity to discuss this, I feel fervently about this and I like learning about this subject painting wall

Leave a Reply